Documents Related to the Azusa Rock Revised CUP
The following is a list of the documents that describe the Vulcan's revised conditional use permit (CUP).
Azusa Rock Revised CUP
|
|
I. Table of Contents & Exec. Summary |
|
|
II. General Background Information |
|
|
III. Location & Environmental Setting |
|
|
IV. Mining Operation Plan |
|
|
V. Rec. Program & Certification |
Environmental Impact Report (EIR) Documents
|
|
Final NOP & NOC signed revised* |
|
|
Initial Study - Azusa Rock |
|
|
NOP Letter Signed* |
Azusa Rock Reclamation Plan Technical Appendices
*Some of the PDF documents served from this site have been modified to make them searchable (through OCR). However, this process does not modify the visual or print nature of the original PDF file. Original documents can be downloaded from the city of Azusa website by clicking on the PDF icon to the left of the document name.